In March 2022 one of AWP’s customers sent his service engineers to the factory in Prenzlau to get a training for the maintenance of AWP’s safety valves. The trainings were held by AWP’s application engineer Erik Jacob, together with senior director sales & product management Nehir Memet.
The recommended maintenance interval for safety valves is five years. For this purpose customers usually dismantle the safety valves from their plants and send them to AWP’s factory in Prenzlau. Now, after the training the service engineers are certified by AWP to do the necessary maintenance works directly on site without removing the valves from the system. This saves a lot of time and therefore reduces costs since the system’s downtime can be kept to a minimum.
Part of the training was a practical exercise to re-set and re-adjust safety valves.
If you are also interested in receiving a training to maintain AWP safety valves on your own, please do not hesitate to contact us. We are glad to support you.